VoyForums
[ Show ]
Support VoyForums
[ Shrink ]
VoyForums Announcement: Programming and providing support for this service has been a labor of love since 1997. We are one of the few services online who values our users' privacy, and have never sold your information. We have even fought hard to defend your privacy in legal cases; however, we've done it with almost no financial support -- paying out of pocket to continue providing the service. Due to the issues imposed on us by advertisers, we also stopped hosting most ads on the forums many years ago. We hope you appreciate our efforts.

Show your support by donating any amount. (Note: We are still technically a for-profit company, so your contribution is not tax-deductible.) PayPal Acct: Feedback:

Donate to VoyForums (PayPal):

Thu, November 21 2024, 05:00Login ] [ Contact Forum Admin ] [ Main index ] [ Post a new message ] [ Search | Check update time | Archives: 1[2]3456789 ]


[ Next Thread | Previous Thread | Next Message | Previous Message ]

Date Posted: - Monday - 02/11/08 - 1:48am
Author: rreeves ()
Subject: REPORT #4--Replacing shims and scarfs
In reply to: Randall, M31, Murre 's message, "Aft Cabin Bulkhead Replacement" on - Monday - 01/21/08 - 9:56pm

This weekend was dedicated entirely to replacing the shim and scarf pieces on both sides of the deck beam.

To that end we started with the port side by cutting through the joint as cleanly as possible. Again, the Fein Multi Master was the right tool for the job. On some parts of the joint, the blade went quickly through; on others it caught on hard wood.

Free Image Hosting at www.ImageShack.us


And often it caught on more ring nails. When replacing the cabin sides, the ring nails we encountered holding the coach roof to the sides were brass (or bronze). But the nails used to fasten the bulkhead to the deck beam and the beam joints and shim were all stainless and were hell on the tiny hacksaw, not to mention my wrist.

Free Image Hosting at www.ImageShack.us



Next we cut away the forward side of the glass wrap that connects the deck beam to the hull.

Free Image Hosting at www.ImageShack.us


And with some thwacking on its aft side, the piece came out cleanly.

Free Image Hosting at www.ImageShack.us



Fashioning and fitting the new pieces was the most challenging job so far. Though the Multi Master did a nice job of cutting out the joints, the remaining surfaces were plenty ragged such that the tracings of the original joint (pictured last week) had to be discarded in favor of measuring depth every few inches along the run of joint and then drawing that pattern onto the new stock. As careful as could be in inches and eights were we but still plenty of shaping with the grinder and the plane was required.

One word of caution: the original beam was not cut square but rather was beveled so that its topside sloped down and aft about 12 degrees (this to keep moisture from collecting on the beam). This bevel was carried to the bottom of the beam AND INTO ITS JOINT. Not a difficult problem once you see it, but if the joint is chewed up by rot, it’s easy to miss.

Note here that this week's shim has been recut and extended out over the deck beam some six inches (why later).

Free Image Hosting at www.ImageShack.us


Performed same operation on starboard side. It was in much worse shape, particularly at that part of the joint right under the starboard side of the companionway hatch. Even so, you can see that the entire deck beam before the joint was good wood and (more or less) half of the joint. Given that this one was salvageable, I think, and the worst of the two, one wonders if extracting these teeth was worth the trouble.

Free Image Hosting at www.ImageShack.us


Fitting the new scarf on starboard side and then the addition of the overlapping shim.

Free Image Hosting at www.ImageShack.us

Free Image Hosting at www.ImageShack.us


Next I “painted” all joints with straight epoxy and then puttied them up with a thick mixture of half West 406 (colloidal silica) and half West 407. I also injected this thick paste with a syringe into all the voids between the deck and beam.

Free Image Hosting at www.ImageShack.us


An then I wrapped the shim with 6 inch biaxial tape. The tape was layed over the shim and scarf and down to the bottom of the beam on boths sides. Though the scarf is fastened from underneath w/three #12 x 3" wood screws, there was no way to get ring nails or any other fasteners back into shim, and if anything, this tape will do a better job of providing strength, not only to the shim, but to the extreme ends of the beam.

Free Image Hosting at www.ImageShack.us


Same procedure for the starboard side with the exception that the voids left by rot had to be puttied in. I also put one layer of 6 inch tape along the entire length of the beam (pictured here) in order to, as they say, seal in freshness.

Free Image Hosting at www.ImageShack.us


And that’s the weekend. The final pictures of the puttied joints don’t do it justice. After much sweat and choking on wood dust, the area is extremely solid.

Free Image Hosting at www.ImageShack.us

Last edited by author: Mon February 25, 2008 02:10:56   Edited 9 times.

[ Next Thread | Previous Thread | Next Message | Previous Message ]


Replies:

[> [> The inside slats -- Randall, - Monday - 02/11/08 - 9:36pm

For those of you who've done this job, did you replace the interior mahogany slats? If so, how? Seems it could easily be a messy job. Weight them down with sandbags? Sit on them overnight? Mine were only glued in place, no other fasteners.

If not reinstalled, how did you account for the 1/4 inch of depth they add to the bulkhead at the coachroof frame and around the splashboard shoulder where they are tucked under? What's weird is that they AREN'T part of the companionway hatch frame assembly, so if left off, some type of spacer has to be added to that top frame and shoulder or else the companionway hatch will be off by 1/4 inch.

I don't want to put them back as they are nothing but decoration, but most if not all came off in good condition, so am mulling...


[ Edit | View ]


[> [> [> Slats -- Mark(AEOLUS), - Tuesday - 02/12/08 - 3:59pm

Nice weekend job Randall. Looks like you could start restoring 31's for a living. I did replace my slats as some had some rot and I couldn't match what I salvaged, so made new ones. You're right about the 1/4" difference as well as glued only. Since they have to be glued up before the bulkhead is installed you can control the gluing process to some degree. And since they aren't structural it doesn't take much to hold them in place. Keep at it.
Mark


[ Edit | View ]

[> [> [> [> Randall, You're Awesome! -- Brett, - Wednesday - 02/13/08 - 3:04am

To those of you that asked for and waited on a reply from me at the beginning of this thread - I’m sorry. I hurt my back at work (lifeflight paramedic) and have been out since. I have not been on this board since my last post and have been VERY limited in what I can do at the boat.

However, Randall seems to have compiled all the answers and info into an awesome package with great pictures. THANK YOU, once again, for the step by step instructions – it makes my life so much easier. I agree with the previous poster who said that you should compile all of your info in to a “Mariner Restoration Guide”.

My project is going pretty slow – but I still have a very optimistic goal of sailing her late spring…. I can dream anyway.


[ Edit | View ]

[> [> [> [> [> Thanks Brett! -- Randall, - Monday - 02/18/08 - 12:36pm

Thanks for the compliment, Brett. Sorry to hear about your back.

Hey, what's the name of your Mariner? Is she posted on the MOA site?

Would still like to see photos of your project. I find it really helpful to see other approaches.

Dream on, Brother! Spring is comin'.

RR


[ Edit | View ]





[ Contact Forum Admin ]


Forum timezone: GMT-5
VF Version: 3.00b, ConfDB:
Before posting please read our privacy policy.
VoyForums(tm) is a Free Service from Voyager Info-Systems.
Copyright © 1998-2019 Voyager Info-Systems. All Rights Reserved.