VoyForums
[ Show ]
Support VoyForums
[ Shrink ]
VoyForums Announcement: Programming and providing support for this service has been a labor of love since 1997. We are one of the few services online who values our users' privacy, and have never sold your information. We have even fought hard to defend your privacy in legal cases; however, we've done it with almost no financial support -- paying out of pocket to continue providing the service. Due to the issues imposed on us by advertisers, we also stopped hosting most ads on the forums many years ago. We hope you appreciate our efforts.

Show your support by donating any amount. (Note: We are still technically a for-profit company, so your contribution is not tax-deductible.) PayPal Acct: Feedback:

Donate to VoyForums (PayPal):

Login ] [ Main index ] [ Post a new message ] [ Search | Check update time | Archives: 1[2] ]


[ Next Thread | Previous Thread | Next Message | Previous Message ]

Date Posted: 02:20:07 04/24/08 Thu
Author: ¦óÚZµØ±ø»«©P+Åwªï¬µÊ\: jameslam@hkpro.com.hk
Author Host/IP: NoHost / 202.153.9.158
Subject: ²bÎx¦óÚZµØ±ø¤²µó©O+Åwªï¬µÊ\: nancychow@hkpro.com.hk
In reply to: ¦óÚZµØ±ø»«©P+Åwªï¬µÊ\: jameslam@hkpro.com.hk 's message, "²bÎx¦óÚZµØ±ø¤²µó©O+Åwªï¬µÊ\: nancychow@hkpro.com.hk" on 02:17:38 04/24/08 Thu

Particul­qSpecification
7 SCHEDULE OF SPECIALIST BUILDING SERVICES SUB-CONTRACTORS
The Contractor shall complete the following schedule at the tender return stage.
Type of Specialist Installation
Category in ETWB Approved List
Name of Selected Specialist Sub-contractor
Electrical Installation
Electrical Installation (All Groups)
M¤t
¡Chu
n
---A
n
O
HE HUo r¡O¡B.«_¶êA
m«e ¡A.¡B •.. A
C¥s FU
Mym
Air-Conditioning Installation (All Groups)
¤fnMF MH Dtr
CCTV¡A Security and Staff Call System
Burglar Alann and Security Installation
(All Groups)
RNE

8 TENDER DRAWINGS
: 0-
N-
n¤@ .¡A .. -
E ar-
D¤@
Drawin~ Title
PB(B)/97904/07030¥§E001 PB(B)/97904/07030/EE002 PB(B)/97904/07030¥§E003 PB(B)/97904/07030¥§E004 PB(B)/97904/07030/EE005 PB(B)/97904/07030/ AC001
Location Plan¡A Drawing List and Schematic Wiring Diagram Electrical Layout Plan
ELV - Security and Staff Call System EL V - CCTV Schematic Diagram
EL V - Security¡A CCTV Staff Call Layout Plan A¦ªCon¦Ritioning Layout Plan
PS.BS/15


Schedule of Rate Building Works


Schedule of Rate
Page 1
Item
Description
Quantity Unit Rate
Note:
1. The tenderers should note that the items¡A descriptions and quantities stated¡A with the exception of quantities and additional items inserted by the tenderer¡A in this Schedule form part of the Specification referred to in the Contract.
2. The tenderer should also note that the items and description given in this Schedule a:£ne for the m¥yor items of works only and shall not in any case be regarded as exhaustive.
3. The Contractor is required to price¡A extend and total the Schedule of Works and submit this toge¥Xer with any additional items he may require¡A as the Schedule of Rates referred in General Conditions of Con¥Kact Clause 59(5).
4. Read in conjunction with the Drawin­¦¡A General Specification for Building 2003 Edition and Particular Specification.
5. The dimensions and approximate quantI¥@es shown in the drawings and descriptions below are for indicative purpose only. The tenderer is required to ascertain dimensions and the exact nature an¦Rextent of the Works on Site before submission of Tender.
Carried to Collection
$
¤¤


Schedule of Rate
Item
Description
6. Unless otherwise stated¡A all
demolition and downtaking items shall be deemed to include removal of existing old materials fo¥}ld not suitable to be inc¡C¤¤orated in the Works and making good of disturbed areas.
7. Unless otherwise stated¡A all
replacement shall include demolition or downtaking defective items or old 1te¤fIS.
8. Unless otherwise stated¡A work items involving constructIOn or reconstruction of timber works shall be deemed to include timber preservative¦]¦¹ªºnt and termite trea¥[lent in accordance with the Particular Specification.
9. The Contractor shall provide all ªºcess¬ûy temporary supports¡A props¡A and the like to protect and secure s¤Üuctures¡A buildin­¦¡A land and the like during execution of Work against damage¡A collapse¡A crack¡A settlement¡A falling over and etc. to the satisfaction of the Architect.
10. The Con­qactor shall provide all hoisting¡A li¤¡ing¡A moving or rotatmg
¡A equipment while executing the Work to return deformed¡A settled and etc. P¬õts of the building to their original positions and forms
Carried to Collection
Page 2
Quantity Unit Rate
$¤¤

[ Next Thread | Previous Thread | Next Message | Previous Message ]



Forum timezone: GMT-8
VF Version: 3.00b, ConfDB:
Before posting please read our privacy policy.
VoyForums(tm) is a Free Service from Voyager Info-Systems.
Copyright © 1998-2019 Voyager Info-Systems. All Rights Reserved.