VoyForums
[ Show ]
Support VoyForums
[ Shrink ]
VoyForums Announcement: Programming and providing support for this service has been a labor of love since 1997. We are one of the few services online who values our users' privacy, and have never sold your information. We have even fought hard to defend your privacy in legal cases; however, we've done it with almost no financial support -- paying out of pocket to continue providing the service. Due to the issues imposed on us by advertisers, we also stopped hosting most ads on the forums many years ago. We hope you appreciate our efforts.

Show your support by donating any amount. (Note: We are still technically a for-profit company, so your contribution is not tax-deductible.) PayPal Acct: Feedback:

Donate to VoyForums (PayPal):

Login ] [ Main index ] [ Post a new message ] [ Search | Check update time | Archives: 1[2] ]


[ Next Thread | Previous Thread | Next Message | Previous Message ]

Date Posted: 06:02:34 02/21/09 Sat
Author: BETH SANTANA
Author Host/IP: cache-dtc-ae14.proxy.aol.com / 205.188.117.18
Subject: CARIANNE CROSS

CARIANNE CROSS PASSED AWAY 2-15-09 AND WAS A VERY TALENTED TATTOO ARTIST IN SHEEPSHEAD BAY AS WELL AS KAREOKE.
PLEASE KEEP HER IN MEMORY IF U HAD KNOWN HER

[ Next Thread | Previous Thread | Next Message | Previous Message ]


Replies:

[> bxsiؿvKyO+wוּ\: hfyuen@kcbprogress.com.hk -- KyP+wוּ\: hfyuen@kcbprogress.com.hk, 10:20:30 07/08/09 Wed (202-94-136-217.cust.bit-drive.ne.jp/202.94.136.217)

CONDITIONS OF TENDER
CT-0l TENDER DOCUMENTS ISSUED
The tender documents listed hereunder shall be issued to the tenderer:-
01 Form of Tender (including the appendix to the General Conditions):
02 Conditions of Tender
.03 Supplementary Conditions of Contract;
04 Scope of Works;
05 Summary of Tender; and
06 One set of Drawings.
CT-02OTHER TENDER DOCUMENTS
01 The tender documents listed hereunder shall not be issued to the tenderer but shall be available for inspection during
normal office hours at the office of the Architect:-
01 Standard Articles of Agreement for Building Contract;
02 General Conditions of Contract;
03 Land lease, Conditions of Sales, Conditions of Exchange, Permit, License, etc, and other documents of the Site.
02 All other tender documents, reports, drawings, etc, not listed in Clause CT-01 and Sub-clause CT-02.01 of these
Conditions of Tender hereinabove but are specifically stated in the tender documents as forming pafof the tender or are referred to elsewhere in the tender documents are available for inspection during normal 0ffce hours at the office of the Architect
CT-03TENDER DOCUMENTS TO BE RETURNED
.01 The tender shall be enclosed in a properly sealed envelope and clearly marked on the outside of the envelope as:-
Tender for Alterations and Additions Works to Ground Floor and Basement at Hollywood Plaza (Phase II) 610 Nathan Road, MongKok,Kowloon
and shall be deposited on or before the deadline fixed for receipt of tenders at the place and in the manner as set out in the said letter and shall consist of the following:-
o I The Form of Tender with the Appendix annexed thereto duly completed, signed, witnessed and dated.
02 The General Summary including the Summary of Tender fully completed, priced as to each item, extended,
cast and totaled
.03 The Schedule of Rates with reasonable estimated quantities to substantiate the Summary of Tender in
accordance with Clause CT-20 of these Conditions of Tender hereinafter, the Specification
04 The tenderer's Preliminary Programme Chart in accordance with Clause CT-28 of these Conditions of Tender
hereinafter.
05 The tenderer's preliminary proposal on all worksqincluding temporary and permanent works, which the
tenderer is required to assume design responsibility
02 All other tender documents issued for tendering purpose other than those listed in Sub-clause CT-03.01 hereinabove
shall also be returned in a separate envelope at the same time.
CT-04TENDERERS TO CHECK DOCUMENTS ISSUED

The tenderer shall be required to check the numbers of the pages of the documents against the page numbers given in the Contents of the tender documents and to check the Drawings issued for tender against the Schedule of Drawings

and shall inform the Architect at once of any missing page or drawing, or any duplicate or indistinct of the same, and shall have the same rectified by the Architect.
CT-05TENDERERS TO INSPECT DOCUMENTS NOT ISSUED
The tenderer shall be required to inspect the tender documents and other document referred elsewhere in the tender documents not issued but are available for inspection at the office of the Architect to obtain his own information on particulars and details not given in the tender documents issued which may affect his tender and his planning of a methodical construction sequence to complete the Works within the Contract Period. The tenderer shall be deemed to have satisfied himself before submitting the tender as to the conditions and obligations which may be imposed upon him by these documents not issued and shall not be entitled to any claim whatsoever for extra cost and expense or for extension of time for the completion of the Works on grounds of ignorance of the obligations imposed by these documents not issued.
CT-06 QUERIES
Should the tender for any reason whatsoever be in doubt as to the precise meaning of any item or figure contained in the tender documents, he shall inform the Architect in order that the correct meaning may be decided before the deadline fixed for receipt of tenders. All queries must be raised seven days before the deadline fixed for receipt of tenders. No answer to any such query, except if in writing addressed to all tenderes by the Architect, shall affect the contract documents. Any such written clarification and explanation issued to tenders shall be bound in and shall form part of the contract document
CT-07NO CLAIMS FOR MISTAKES NOT RECTIFIED
No liability shall be admitted, nor any claim allowed, in respect of errors in the tender due to mistakes or misinterpretation in the tender documents which should have been rectified in the manner described in the foregoing Clauses CT-05 and CT-06 of these Conditions of Tender
CT-08OUALIFICATION AND UNAUTHORIZED ALTERATION TO TENDER
No qualification of the tender of the tender documents nor unauthorized alteration or erasure to the text of the tender documents shall be permitted. Any tender containing any qualification or unauthorized alteration or erasure may cause the tender to be disqualified. The failure of the Architect to discover any qualification of the tender or of the tender documents or unauthorized alteration or erasure to the text of the tender document shall not nullify the intent and enforcement of the full original tender document. No qualification of the tender or of the tender documents nor alteration or erasure to the text of the tender documents shall have any effect in nor form any part of the contract document unless express prior written acceptance has been given by the Architect in connection therewith.
CT-09 CORRECTION OF TENDER
Should the tenderer wish to delete or alter any figure or wording written by the tenderer in the tender documents, it must be done by clearly deleting such figure or wording, adding the correct figure or wording in its place where appropriate and having the deletion or alteration initialed or signed by the same signatory to the Form of Tender.
CT-10 ERRQRS DISCOVERED BEFORE OPENING TENDERS
In the event of a tender discovering a genuine error in the tender after it has been deposited, attention in writing may be drawn to the error and an amendment submitted. Any such amendment to the tender deposited if submitted on or before the deadline fixed for receipt of tenders may be accepted.
CT-11 RECTIFICATION OF ERRORS
.01 The tender Sum shall be regarded as a lump sum tender and shall not be amended for errors found in the examination
of the tender. The following errors should they occur in the tendered Schedule of Rates shall be rectified and altered in red ink:-
.01 Rates to agree with reasonable estimated quantity and extension in cash column, or extension to agree with
reasonable estimated quantity and rate, subject to the Architect's sole discretion;
.02 Errors in casting of cash columns; and
.03 Errors in carrying forward totals to collections or summaries.
.02 The total eor, if any, discovered in the tender shall be calculated as a plus or minus percentage of the corrected


Tender Sum minus preliminary items and provisional and prime cost sums and shall be applied to the tendered rates for the purposes of pricing variations. If the percentage error is less than 0.5 percent, no adjustment shall be made.
CT-12 ERRORS REVEALED
Should examination of a tender reveal any error, discrepancy, omission or apparent under-pricing, the Architect may query this in writing with the tenderer. No query or series of queries shall be considered comprehensive nor shall they indicate a proposal to change the tendered price or the tendered time for completion. Where in the opinion of the Architect the magnitude of such error would involve the tenderer in serious loss if awarded the contract. the nature and amount of such errors may be communicated to the tenderer who will be asked to confirm in writing that he is prepared to abide by his tender or to withdraw the tender
CT-13VALIDITY
Tenders shall be valid for a period of ninety calender days from the deadline fixed for receipt of tenders unless a different period is stipulated in the Form of Tender. If this period is exceeded, the tenderer shall be requested to confirm the validity of his tender prior to acceptance.
CT-14 EMPLOYER NOT BOUND
It is expressly stated that this invitation to tender and the receipt of a bid from a tenderer is not intended to create any legal relation. It is also expressly stated that the Employer shall not be bound to accept the lowest or any tender he may receive. In the event that alternative tenders are requested from the tenderer and the Employer contemplates to accept any of the tenders received, the Employer shall be at liberty to choose between and to accept either the basic tender or any of the alternative tenders submitted, if any.
CT-15 TENDER MADE BY PARTNERSHIP
If a tender is made by a partnership or an unincorporated body, the names and residential addresses of all the partners must be given.
CT-16TENDER MADE BY CORPORATION
If a tender is made by a corporation or limited company, the names and residential address of all the directors must be given
CT-17VALID REGISTRATION TO BE GIVEN
The tenderer shall be required to be in possession of a valid Business Registration Certificate issued under the Business Registration Ordinance and a valid Certificate of Registration of Registered Contractor issued under Section 8 of the Buildings Ordinance. The tenderer shall be required to give the number and date of the Business Registration Certificate and the number and date of the Registration Certificate of Registered Contractor in the Form of Tender and to furnish copies of these certificates upon request. The tenderer shall not be permitted to use a certificate of registration of registered contractor belonging to another contractor whether or not a parent company or subsidiary or associated company or to use the name or registration of another contractor for the purpose of complying with the provisions of the Buildings Ordinance in respect of the execution of the Works. The tenderer shall be required to give the number of the Certificate of Incorporation issued under the Company Ordinance in the case of a limited company or an incorporated body
CT-18 SITE VISIT
The tenderer shall be required to visit, inspect and examine the Site and its surroundings to acquaint himself as regards existing roads or other means of communication with and access to the Site, the nature of the ground and sub-soil, the form and nature of the Site, the risk of injury or damage to persons and property within and adjacent to the Site, the nature of the materials (whether natural or otherwise) to be excavated, the nature of the work and materials necessary for the timely completion of the Works, the accommodation required and generally to obtain his own information on particulars and details not given in the Particular Specification and the Drawings and on all matters affecting his tender and the execution of the Works.
CT-19 PRELIMINARIES ITEMS
The tenderer shall be deemed to have made allowance in his prices generally to cover items of Preliminaries, profit and attendance and other expenses in connection with Prime Cost, Provision and other items if these have not be priced against the respective items.
CT-20SCHEDULE OF RATES
The tenderer shall be required to submit detailed Schedule of Rates prepared in the following manner:O
.0 I Each item referred to in the Particular Specification or shown on the Drawings shall be given the following:-
.01 A brief description of the item;
.02 The tenderer's reasonable estimate of its quantity;
.03 The unit used for measurement; and
04 The total calculated price for the item.
.02 The Works shall be measured, priced and totaled separately under the headings as listed in the Summary of
Tender.
.03 The following units of measurement shall be adopted throughout:-
0l Items given by weight Kilogram (kg)
.02 Items given by volume Meter cube (cube)
.03 Items given by area Meter square (super)
.04 Items given by length Meter run (run)
.05 Items enumerated Number (no.)
.06 Items listed individually Sum or Lot
.04 The use of lump sum in the Schedule of Rates shall be avoided wherever possible. The tenderer may be
required to break into rates any lump sum in the Schedule of Rates.
05 The total figure given in the Made-up of Tender and in the Schedule of Rates shall be equal to the Tender Sum given in the Form of Tender.
CT-21SUFFICIENCY OF TENDER
The tenderer shall be deemed to have satisfied himself before tendering as to the correctness and sufficiency of his tender for the Works and of the rates stated in the Schedule of Rates and the Make-up of Tender, if any, which rates shall except in so far as it is otherwise provided in the tender documents, cover all his obligations under the tender documents and all matters and things necessary for the proper completion and maintenance of the Works.
CT-22 SUMMARY OF TENDER
The tenderer shall be required to complete and enter against each and every heading in the Summary of Tender the total in respect of items under that heading, cast, total and transfer the totaled Tender Sum to the Form of Tender.
CT-23LUMP SUM TENDER
The tender shall beLump Sum" for the carrying out of the whole of the Works in conformity with the Agreement and Schedule of Conditions of Building ContractA the Supplementary Conditions of ContractA Particular SpecificationA Drawings, these Conditions of Tender and all other relevant tender documents. All tender documents are complementary and what is required by one shall be as binding as required by all. The Tender Sum shall be inclusive of all labour, materials, equipment and other items necessary for the proper execution and timely completion of the Works
CT-24 TIME FOR COMPLETION
The tenderer shall be required to insert in the space provided in the Form of Tender and in the Appendix annexed thereto the number of calendar days that he will require to complete the Works, including but not limited to design, submission and obtaining approval and consent from the Building Authority, the Water Authority, the Director of Fire Services and such other competent authority for all works which the tenderer shall be required to take up design responsibility (e.g. all fire services installation proposals, working procedures etc)


acceptance of the Architect, the Building Authority, the Water Authority, the Director of Fire Services and such other competent authority such test and inspection and testing of installation and equipment as are required, and includes allowing for all standing time required to complete all formalities and procedures in connection therewith. This time shall be inclusive of Sundays, gazetted and ungazetted holidays, wet days and days of inclement weather including typhoons falling within the Contract Period. Time shall be the essence of the Contract and the time inserted in the tender by the tenderer shall be an important factor in the evaluation and award of the Contract.
CT-25 ACCEPTANCE
If a tender is accepted, the successful tenderer shall be notified of the acceptance of his tender by a letter from the Architect written for and on behalf of the Employer, with or followed by an instruction to commence work. Unless and until a formal agreement is signed and executed, the tender submitted together with the written acceptance thereof by the Architect for and on behalf of the Employer, subject to Clause CT-13 of these Conditions of Tender, shall constitute a binding contract between the successful tender and the Employer.
CT-26 FORM OF CONTRACT
The Form of Contract shall comprise the Standard Articles of Agreement for Building Contract, the General Conditions of Contract (both of which are listed hereinbefore in Clause CT-02 of these Conditions of Tender and are available for inspection during normal 0ffice hours at the office of the Architect) together with and as supplemented, varied and modified by the Supplementary Conditions of Contract issued by the Architect as part of the tender document in accordance with Clause CT-01 of these Conditions of Tender hereinbefore. The General Conditions of Contract (hereinafter referred to as "the General Conditions") are based on the "Schedule of Conditions of Building Contract (Standard Form of Building Contract) for use in Hong Kong, (Private Editions Without Quantities), issued under the sanction of the Hong Kong Institute of Architects, the Hong Kong Institute of Surveyors, and the Society of Builders, Hong Kong, Second Edition 1976 (April 1998 Revision)"
CT-27 PRELIMINARY PROGRAMME CHART
01 The tenderer shall be required to submit together with the tender a "Preliminary Programme Chart" in the form of a
Critical Path Network Analysis or Time Scaled Bar Chart showing the proposed construction method, sequence, stages and order of proceeding with the Works and shall include the following:O
01 Any activities that have a significant bearing on the time required to complete the Works;
.02 The work carried out by each trade in each area as separate activities;
.03 Significant off-site activities, such as shop drawings or pre-fabrication;
.04 Any information, approval, supply or equipment which the contractor nominates as necessary for him to
maintain his programme and which shall be provided by other parties and the site activities dependent on these to be clearly shown;
05 Any contingency allowance shall be shown separately from the activities to which it apply;
06 The duration of each activity in days with any activity extending over a period of more than two weeks to be
broken down into sub-activities except for procurement of materials and equipment;
07 The restraint of any activity on any other activity; and
.08 The sequence of activities which constitute the critical path shall be clearly identified.
.02 The submission to the Architect of such programme and any revision thereto shall not relieve the tenderer of any of his duties or responsibilities under the Contract
CT-28 UNITS AND FORMAT OF SUBMISSION
01 All submissions to the Architect involving units of measurement shall, unless otherwise directed, be submitted in
Metric units (i.e. International System of Units, or SI units). The execution and submission of drawingsA plans and constructional details or shop drawings shall adopt the following scales unless otherwise directed:O
.01 Location Plans
1 : 500/1000/2000
.02 Site Surveys
1 : 50/100/200/500

.03 Building and Constructional Layouts
1 : 20/50/100
04 General Assemblies
1:5/10/20
.05 Details
1 : 1/2/5/10
02 All documentation and drawings shall be submitted on paper of size in the International "A" series the principal dimensions of which in millimeter are as follows:-
]-
A0 841 x 1189
Al 594 x 841
A2 420 x 594
A3 297 x 420
A4 210x297
A5 148x210
.03 The tenderer shall be required to place particular attention to the submission of Schedule of Rates which must be
made on A4 size paper of 210 mm x 297 mm and to the submission of Preliminary Programme Chart which must be in size of A2 or A3.
CT-29 CONTRACT DOCUMENT
All tender documents to which reference is made in Clauses CT-01 and CT-02 of these Conditions of Tender hereinbefore including but not limited to the Form of Tender, the Conditions of Tender, the Articles of Agreement where completed, the General Conditions of Contract together with the Appendix thereto, the Supplementary Conditions of Contract, the Particular Specification, the Drawings, the General Summary and the Schedule of Rates as required to be submitted by the tenderer under Clause CT-20 of these Conditions of Tender, the Letter of Acceptance together with any Contractual Correspondence and any other relevant document accepted by the Architect as part of the Contract document
CT-30 STATEMENT OF CONVICTIONS UNDER THE EMPLOYMENT ORDINANCE (CAP. 57)
01 A tender may not be considered if, during the 12 month period prior to the closing date set for receipt of tenders, the
tenderer has had there or more convictions in respect of separate incidents under the Employment Ordinance (Cap. 57) which individually carry maximum fines corresponding to Level 5 or higher within the meaning of Schedule 8 to the Criminal Procedure Ordinance (Cap. 221), whether or not he has been formally suspended as a result of such convictions. If the tenderer is a partnership, consortium or joint venture, the tender will not be considered if any member of the partnershipA consortium or joint venture has three or more such convictions during the 12 month period, whether or not such member has been formally suspended as a result of convictions.
02 The tenderer shall, upon request from the Architect, submit a statement of either all convictions under the
Employment Ordinance (Cap. 57), and the dates of all such convictions, during the 12 month period prior to the closing date set for receipt of tenders, or a statement of no conviction. The statement shall be certified by a person authorized to sign contracts on the tenderer's behalf. If the tenderer IS a partnership or consortium or joint venture, each member of the partnership and consortium of joint venture shall submit such a statement.


[ Edit | View ]



[> QMBԬcxlͽ+gӭը: hfyuen@kcbprogress.com.hk -- Ԭcxle+gӭը: hfyuen@kcbprogress.com.hk, 13:26:21 12/24/09 Thu (client-82-26-198-228.pete.adsl.virginmedia.com/82.26.198.228)

¡101101A103?
?̫ӻ¡ 101103?
BS޹Ͷ˕
*رP?ؿ:2006101 13r* *BT*


?̫ӻ¡10IOIA103? Ͷָ
1.Ͷļ():
һͶָ| ڶͶ˱
ݹ̺ϼsl IJʩ?t
岿ݾS޹̈r
ݹ?ĿͶ?r
2.Ͷύ֮˕?:
֮Ͷ˱񡢾S޹̈rμͶ?r?Բɫ֮ɫ{ɫԭӹP ɫī֙C󣬁K׹̔΃r?˃rc?rK??Ͷ˱ w¼]ڣȻܷʽܷã?]¡101101A 103?BS޹Ͷ˕BͬY20061019()5rǰ ؾ?ïֽ57??̧֮Ͷ䡣Ͷ?СͶ˕ ݣȫ̔΃r?rc?rȣ?o`бҪrɸ DӱfKӲͶļȣe©Կ܌Ͷ֮Ͷ˲@Ӽ{
(II)Ͷ?ύY
(ȡ˕rύYϣtoٴύ) :
(a)˾]C;
(b)˾Ч̘֮Iյ?(C) ; (c)]ԳRGBC (C) ; (d)]ˮ(?e) ;
(e)]?Iн(C) ;
Ĺ˾?ՠr(yC) ;
(g)н̛]漰VA??(?C) ; (h)ȫ(C) ;
(i)ˆTĚv(C) ;
(j)˾?(?) ; (k)vرPܹĚvC
(1)ɼFrMеĹ?ĿQOc?ģڡr͑? jYϼ]š
(m)Ͷ˱ȵͶ?rc̈rμͶ?r?
Ͷָ
ע:δۇHB?޹˾(?Q鹤??)Sڙ޸ģͶ ̲ÌͶļ޸ģtȡͶY
Al


?̫ӻ¡101lOlA103?
(m)Ͷ˱ȵͶ?rc̈rμ̰b?H?
Ͷָ
ע:δۇHB?޹˾(?Q鹤??)Sڙ޸ģͶ ̲ÌͶļ޸ģtȡͶY
3.Ͷ̱?(Buildings Department)]Եһн(ROBe)
4.Ͷ̑ЙzИ˕ļǷRȫz©ظ?֪ͨ?? Ըa䡣
5.Ͷ̌˕ļ?Ŀв֮??֪ͨ??Աڽؘǰ?ס
6.춘˕ļ֮?`п˜˃re`˵z`ɰԸ re`֮?׷JӼ{
˕ļcͶļҪͶˌܲӼ{
S޹̈r΃֮κ?ĿδσrPMÕ?Ѓr? ĿĆ΃rlȡ
9.й?Ŀ?S޹̈r֮?ĿքeϹ΃rͶ̼􌢔??Ŀһ ?~ͶrҪÿ?΃rքetȡͶY
10.Ͷf˕ļlXe`?ԕ֪ͨe`?֪ͨ ?ڽֹͶǰfɫ@Ӽ{
11.Ͷ˃r?ȫ?rʽ(Lump Sum Tender)
???˘˕rlFЇe`JʹͶ܇ؓpʧe`֪ͨͶ Ҫ_SͶ?rͶˆλҪtͶ˿܆ʧ@]ęC
¡10IOIA103?IF(?Ql)һҪ͘ߣ಻ x֮Ͷκν?
??ֻ??lyIOܹ̣c?н̹̼Z?K֧ϼsн κιMá
Ͷ˕ÿ??ÿ?֮·?aͶ̰lFκ?z©Ӱӡ?֪ͨ? ?ȡظ]յͶ֮?֪ͨ??
A2


?̫ӻ¡101I01A103?
Ͷָ
S޹Ͷ?t
l ַ ??
ַ
:¡101101A103?IF :?̫ӻ¡ֵIJ101A103?
:ۇHB?޹˾
:??4-6?ʩUB11ǖ|
Ͷ
ַ
ʩc:?̫ӻ¡101101A103?

1.Ͷ̱?(RGBC)ˮ(һ?ˮ)ռC?Jɵ?Iн
գ?IˆT]CЧ̘֮I?(c˺?ͬɽ)
2Ͷ˕?ṩոͶָ2l2?]CYBͬ˕һ𽻻ء 3.Ͷ˕?ͬ?ͼͬ?֮??
4.Ͷ̱?S??֮رPˆTܳ׼ʩr֮g?? 5Ͷؘ̽˕r?ʩ??MAʩDȡ
6.Ͷؘ̽˕r?һݡ
7.ͶʽȫYόx֮Ҫl
ϗl
1.lн^Ӝpx?ĿИghИ˃ֹͣИˡ
2.lн^QИͶ̣KһͶ̡
3.Ͷ?Ͷ˕ŷܷw£ָؘ˕rgǰͽָc֮Ͷȣr ύ֮˕
4.BSИ˞֮ḻOɃlίɹ??Ρ
5.Ͷ춽Ŀ˕ᣬò??jlPʿͶ􌦘˕?}??j ??
]:Ͷ˕~SЧڞ:ɽؘ?180Ч
A3


?̫ӻ¡10IOIA103? ̹Г?
1.Ͷ_ǰ?ʽָ?kf/o֧̣Kd?֮a؁Դ ȣl??z?׼?z?֮Ͻ־?춃lָ֮λá
2.Ͷ?ǰṩرP?֮һаȫ߼Oʩlr֮ȫK ȫñoּoֵȣOʩȼϰ֮\ͲΣUʾƣܵײ Ϸ]ĵ֮ȫIȡ
3.н??Ƹ?ȫ?֮رPO(ܹ) /JY񹤳?ײ?̱Oܣ??رPһ \ļ?jR󹤳̵ȣ?IͶVϯ̕h
4.ʩgн֮̌˱?Mpٌס֮Ӱ?ʩr?厧CR K?_رГһ?ΣMv֮˼ˆTÿMr?? C?a?e˔ȡ
5.ІT??IڹU؃ȲƸ÷Ƿڹδ?֮ˆTlFвz ?¡ܼԷxZȣн?Гһз?λpʧ
6.̹ڞ鲻90?죬ˮ졢ռ?ڣͶcl?s14 ?;δܿÿPێ$2000.00Ԫ糬^?֮ʮδܿ lЙջسЙ࣬н̲ý~Ҫڣ?hָȫɣ ?l???պϸ
7.н?춄ӹǰṩCCļK?sʮȻʩǰʽCļ ?Mȱl??
8н?Zrպϼs֮M;н?ÿfZ蹤?? ??ں?н̵ʩᣬ_?ڑĽ~K?lʩ|CMȈ ol??ĩ?֮Z⣬ÿ˵Ŀ~۳ٷ֮ʮ鱣 ( Retention Money )l?춹ʩClʮȣ?ʩCdy aoн̡
9̵ıڞһKɹ??lC"?㡣Aۿ鹤̺ϼs? rİٷ֮ʮ( 10%)н???ڱڃޏͼκϻgϺϼs? ҪIJϸ񹤳̣ޏ͹Mɳн̳Гl걣ڕrн̱?_ ֮ȱ?ɹ??MЙz?l?C"l֧ʣN֮10% ڱ̽
10.?
_ 깤
Ͷָ
r?
ڽ߱~ ?ĿY
ɰlC"?12?
??l?ͬ14_ 90?
(Bmˮ졢ռǼ)
(]:̨֮_20mm?ˮ) ÿPHKB000.00Ԫ
ϼs~ٷ֮ʮ(10%)
lй깤Cʮ?
A4


?̫ӻ¡101101A103? Ͷ˱
Ͷ˱
:?̫ӻ¡10101A103?I
1.?˽?S޹̣?xtںϼsИļеЗlS ޹?Ŀݵȣ/˾?Թ̽~:
ێ(?)K$) Ĵr򰴺ϼs?Ĵrм̡
2./˾Ͷ˕Ӽ{rCںϼsļ?(Bmˮ켰? )ȳ켰ɱͶ˕?S޹̡
3./˾ͬⱾͶ˕ЧڏĽֹͶ?180죬ڃȱͶ˕/ ˾зɼslЧڃȽӼ{Ͷ˕
4.ֱp(lͶ)?ʽϼsֹͶ˕ڃlӼ{ጢЧϼsKp мs
5./˾׃lһҪ͵Ͷ˕յκΘ˕಻ͷQκͶ ?
6./˾ͬͶ˫@Ӽ{14lύ]JəC??lļsC Փ
7./˾_JͶ˼l򽨺B?lPИļ޸֪ͨPݡ
Ͷ߱??¹˾Y:
1.ͶQ: () : (Ӣ)
2.]Եַ
: ()
:(Ӣ)
3.???a
4.?a
81


;?̫ӻ¡101101A103?
]Գн?a/ÝM:
6.̘I?C?a /ÝM
]ˮ?a
8.?Ik?a /ÝM
9.˾w
10??˻@ڙ? 11.
12.?λ
13.?^? 14.
15.?λ
16.ַ
17.
Ͷ˱


?̫ӻ¡10101A103? S޹̈r
?Ŀ λ΃r(HK$) ~(HK$)
1.0 һʩ
1.1 н鹤?Iȫ(Contractors Alltsks)
ڶ?αUڹU(Employees' Compensation)
ιͶ~ޞێҼǪfأ(HK$10000000.00)
ڔн̱?Mйǰ?IU^ļ(?
IFQ)нδsṩUļI
?IUKĹM۳һ_֧
]:FЙָʾнضU˾?I
U?κwʩڣڼ`ӵĹڡ
1.2 нbOָʾbOAڡFڼָʾZԱκ
˻?v߿չ܂?ܓpK?˽b
CȣṩľAo
1.3 ̮a֮UϣҪ֧U?M ?
1.4 ??bRrˮ?báRrˮ?bñ?
PҪ򹤳?Ҫ֮ˮM?MɷF֧ ?
1.5 Yȫ?vرPܹˆT(Yv͞Tl)
1.6 ļs^(Performance Bond)
(1)??ǰ?IKf^蹤???˼Jɣ
⌢?^蹤??跨F
(2)Ч?ʩ?Чɼ?l깤C
ᣬ֪ͨFl??^
(3)^]ί?QλáЧڼ~
^~?鹤̺ϼsrٷ֮ʮ(10%)
1.0??~:
(5) 1







S޹̈r

?Ŀ λ ΃r(HK$) ~(HK$)
1.0 һʩ
1.1 н鹤?Iȫ(Contractors All risks)?αUڹU(Employees' Compensation) ,ǴιͶ~ޞێҼǪfԪ(HK$ 10,000,000.00)ڔн̱?Mйǰ?IU^ļ(?ИIFQ)нδsṩUļ,Iɴ?IUKĹM۳һ_֧
]:FЙָʾнضU˾?I
U?κwʩ,ڼ`ӵĹڡ 1 ?
1.2 нbOָʾbOڡFڼָʾZ,Աκ˻?v߿չ܂?ܓpK?˽bC,ṩľAo 1 ?
1.3 ̮a֮U,Ҫ֧U?M 1 ?
1.4 ??bRrˮ?báRrˮ?bñ?PҪ򹤳?Ҫ֮ˮM?Mɳн֧ 1 ?
1.5 Yȫ?vرPܹˆT(Yv͞T1) 1 ?
1.6 ļs^(Performance Bond )
(1)?_ǰ?IKf^蹤???˼J,⌢?^蹤??跨F
(2)Ч?ʩ?Ч,ɼ?l깤C,֪ͨȦl??^
(3)^]ί?QλáЧڼ~
^~?鹤̺ϼsrٷ֮ʮ(10%) 1 ?
1.0??~:



?̫ӻ¡ 101 101A 103 ?

?Ŀ λ ΃r(HK$) ~(HK$)
2.0 ܹ
2.1 ??ԷϹ̵Ҫ?춽F֮ρK?ГFܵĽY???Ρ
p,̨,ײÿʮṩ
һ?ббwA塢FƬĻԷֹ?˻?vƽ̨??pP̨,Kw\򼰻̨P̨?Mpٌס?ɲ㼰ԲKͨ̑,KýB?ͬʽ
ײṩIO?ײ?bÕrgƷˮK?,gs3.5סн?HrlҪ,/OϵķIbá
bm?\_塢ˮ,_Ғ챣o?W򷫲Ļ
ɹ,?KBondtec SB33
Ӣɳa׶?ԭmϱ(??)
]:սBرP(ȫ)?ėlṩһаȫOʩ,ɅlĴBԽж?Sָ 1 ?
2.0??~:



?Ŀ λ ΃r(HK$) ~(HK$)
3.0 ?ݼU
3.1 [̵IJλ;[/ȱݵIJλ??Ȧ??ύ
湩B??в[̼ȱݵIJλ?,پ̓Ȳػ?rύڶ݈档ȱݵIJλ?вɫƬ??,KЈDtָʾλáɫƬߴٞ3RAtߴٞA4һʽɷ,ʽ?ʩǰύB?? 1 ?
(sum)
3.2 @ʾ֮λ,?в?̡пռȱݵĻ?,̰?,F?F֧ܡFaЏU???˨ȡʩ˜ʾS޼??,u̵ָʾEpoxy PrimerZincrich Primerͬ?ωT?档
]:
Vидѿp
BˮѿpRonabond PU 150ͬ?ȴעa
͸Y?ѿpRonabond EP21 0ͬ?ȴעa 1 ?
(sum)
3.3 ȻBondtec SB33ͬ?֮ʯʺӺτ1:3Ӣɳaʩ֮λá 1 ?
3.0??~:




?Ŀ λ ΃r(HK$) ~(HK$)
4.0 ?S޹
4.1 ?Ŀ3.0,1000 psi߉ˮ?Bondtec Cleaner 88?ͬ?ϳȥ??͝۹,ֱB?Ϲ̝M⡣
]:δ_B?Ϲ̵Ҫ,B?ЙҪнٴMϴ?,P֮MÄtɳн?? 1 ?
4.2 עApz(̨)
103?c105?֮g?App϶ʯ?ɢʯʺ,Sika- f1ex PRO 2HPApzMp϶,Apz?oN??,Ǭ?OX帲w档 1 ?
4.3 ?Ƥʯ?
B?Ϲ׼?Ŀ4.1ȵĹ̃,ſMṤ:
σɌ2mmAKA Tile Filler?Ƥʯ̄,?ϹָM,?ɵһTile FillerS֪ͨ??˾̵z?,SϵڶTile Filler,ֱõ׼Mеڶ 1 ?
4.4 ?ʯʺ?
B?׼4.14.3ȵĹ̃,M¹
1.TһAKA 201 Acrylic Sealer
2.֪ͨṩ̼??˾řz?K?ô_J
3.TσAKA 501 Aqua-Urethaneˮᡣ?ɫɷFָ
ʩǰ?ṩ3?ʽo跨Fx
4.ɵһr?֪ͨṩ̼??˾řz?K?ô_J
5.н̱?õɹṩ|^
6.ϵr֪ͨ??˾z?
7.?ύ?θo跨F??˾n 1 ?
4.5 ?Fм“QܡTͬһ?Ͳϼ?ɫ 1 ?
4.6 B(֘Ӟ\?˾) ,Bondtec SB33ʯʺӺτӢɳa׶ 1 ?
4.0??~:



?Ŀ λ ΃r(HK$) ~(HK$)
5.0 ҃ȾS޹
5.1 B??λð˕3.0?,Ȳ?컨,?aƽ̹,??aв,Ȼ̻ƽ̹aλҪƽ,Ȼص?컨s,еؽ?,???˾?ա 1 ?
5.2 ?컨ݵбλ(ֻǰ)
?Ŀ5.1,M¹:
1.TһAKA 205 Alkali Resistant Sealer
2.TσAKA Aqua-gloss,?ɫɷFָ
3.ɵһἰr?֪ͨṩ̼??˾řz?K?ô_J,ɉTϵڶ
]:н̱?õɹ̰l_Jš 1 ?
5.3 ?컨ݵбλ(ֻǰ)
1.ص?FU,ͬr?Ŀ5.1
2.Uӱ,K??ƽ
3.TσAKA Aqua-gloss,?ɫɷFָ
4.ɵһr?֪ͨṩ̼??˾řz
?K?ô_J,MеڶṤ
]:н̱?õɹ̰l_Jš 1 ? rĿ
(?)
(?r)
5.4 FS(FڡF򡢴)
ѹλFn?,KTһtջƴ,?ɫɷFQ,Qp 1 ?
5.5 Q҃Ș݃ȼp֮? 1 ?
5.0??~:
























?Ŀ λ ΃r(HK$) ~(HK$)
6.0 ̨P(?Ŀ6.26.3ÿ?򼰲ϵr?֪ͨ??˾z?)
6.1 ̨Mȫˮ̹:
1.?̨̨?ʯʺ,̨
^ʯ,Bondtec SB331 : 3Ӣɳ
M20mm̨UKm?бˮʽ
2.?ԭ̨?,Լtu?O?,?ԭ
гߴDt
3.T϶1mmAH Seamless MembraneˮĤ
Tϵ̨漰??(⼰)ߌ
¶̨?,ʩ˜?ָʾ
4.Bondtec SB33ͬ?ϻ1: 3ӢɳM
25mmڶ̨U,Uӱ?һ
UW,UWw?_15mm
5.?O300mm x 300mm x 30mmu춵̨
,ÿ4׾xA20mm϶עApz,
ӞSikaflex-Pro 2HPͬ?
6.72Сr©ˮy?
]:̨ˮ̱?ṩʮ걣B 1 ? ߌ
λ

6.2 ?̨ˮ
1.?̨?̨Թ?ʯʺ
ֹ,̨^ʯ
2.Bondtec SB33ͬ?ϻI: 3Ӣɳ
M25mm̨U,Uӱ?һ
UW,UWw?_15mm'Kmб
ˮʽˮλ
3.Tσ1mmShelter Primerˮr,
?wL?ʯ
4.Shelterbit (Slated Finished)ˮ?O
,Kչָʾʽg
5.48Сr©ˮy?
]:?̨ˮ̱?ṩ걣B 1 ?
]:ʩr?ṩRr©ʩ 6.0??~:

















?Ŀ λ ΃r(HK$) ~(HK$)
7.0 ϵy
7.1 Qˮˮϵy
Qˮ,fгߴABFͬ?uPVCɫzB304?aס
]:̰bλ? 1 ?
7.2 Qˮˮϵy
Qˮʽ,ܷʽBˮBM֦,е̨ˮM֦OUθ,Kgˮˮϵy
fЅՅλÒABFͬ?uPVCɫzB304?aס 1 ?
7.3 Q?ˮˮϵy
QмSB,fгߴIplexͬ?uPVCɫzB304?aס
?BS,ϒABFͬ?uPVCɫzB304?aס 1 ?
7.4 ɺϼsw,н̱?ø߉?Bˮˮɳ 1 ?
7.5 Cȥˮ
λ?Cλ,ABFͬ?uPVC°b
32mmCȥˮB304?a,Ȼg?CλáCȥˮ[λɷFQ?ṩB?zȥˮ
]:?CǷȱ׶δ?zB,Õr?֪ͨF?I 1 ?
7.6 صˮɳޏ
ʩ??̨صm?,ԭгߴ缰λùBS-437F½gˮ
ѬFЃ?ˮɳһ?ˮɳ,ԽYuʽ?Oɳ,bFɳwB 1 ?
7.0??~:




?Ŀ λ ΃r(HK$) ~(HK$)
8.0 x?Ŀ
8.1 Tb?
TT??O?u,φ΃rÿ$20Ԫ;
T??O316?,K?ϴBTƵַ;
ڵ̨漰?(?ֻ?_ʼһŘ?һ??̨)?Ǫʯ,φ΃rÿ$20Ԫ;
]:ʩǰ?ύ3?O?Do跨Fx 1 ?
8.2 b?(Ӽ?ɳнЛQ) ,Kҽgÿ
?λF???·,b?ܡl^
VŴPO
]1 :bǰ?֪ͨFz?Ч,δ_ýЧ,FЙȡ?ĿK۳~,н̲?h
]2:?̨ܷ,??Ŀ6.0M 1 ?
8.3 ˮ?һ?Bˮl,KһMܽg̨
m?λübTYT~Ͻl,ˮlλɷFQ 1 ?
8.4 A?޹˾?һ?B?l,KһM??
g҃Ș,ȫBbȫ600mmB֧ܹ
ϵy,KzB??ϵy,C??IWR2 '
PI^Mɳн?? 1 ?
WR2
A
HKD$50000

?Ŀ ˽˹̈r?Ŀ(ɘI?e֧)
9.0 r?Ŀ λ ] ~(HK$)
9.1 λ҃~b??,B?֮?·g ? ?
9.2 F?Խصײ
ɹ¼ܡ?,?Bondtec SB33ͬ?ϻ1 : 3Ӣɳa?λ
?:ÿƽߞHK$___________
:ÿƽߞHK$___________
9.3 b400mmX?BX֧,Hilti 316?ƽ(^)
Hilti 316??zbǶ֧ܼ?? ÿ
9.4 1.Q^?,?λQ?ǰ
S (ÿl:$___________)
?ˮ (ÿl:$ ___________)
2.CǷȱ׶ҪbˮP
CˮP (ÿ?:$ ___________)







Qʳˮlβ , ˮlλ??ǰ

101? 101A? 103?
5/F ()
4/F ()
3/F(Ę)
2/F (һ)
1/F ()
G/F()































?̫ӻ¡ 101 101A 103 ?

BS ?ĿͶ?r

?Ŀ ̃ ~(HK$)
1.0 һʩ
2.0 ܹ
3.0 ?ݼU
4.0 ?S޹
5.0 ҃ȾS޹
6.0 ̨P
7.0 ϵy
8.0 x?Ŀ ??r
?~

ͶQ

Ͷ?w



[ Edit | View ]






Forum timezone: GMT-8
VF Version: 3.00b, ConfDB:
Before posting please read our privacy policy.
VoyForums(tm) is a Free Service from Voyager Info-Systems.
Copyright © 1998-2019 Voyager Info-Systems. All Rights Reserved.