VoyForums
[ Show ]
Support VoyForums
[ Shrink ]
VoyForums Announcement: Programming and providing support for this service has been a labor of love since 1997. We are one of the few services online who values our users' privacy, and have never sold your information. We have even fought hard to defend your privacy in legal cases; however, we've done it with almost no financial support -- paying out of pocket to continue providing the service. Due to the issues imposed on us by advertisers, we also stopped hosting most ads on the forums many years ago. We hope you appreciate our efforts.

Show your support by donating any amount. (Note: We are still technically a for-profit company, so your contribution is not tax-deductible.) PayPal Acct: Feedback:

Donate to VoyForums (PayPal):

Login ] [ Contact Forum Admin ] [ Main index ] [ Post a new message ] [ Search | Check update time ]


[ Next Thread | Previous Thread | Next Message | Previous Message ]

Date Posted: 21:07:28 02/13/10 Sat
Author: echohawk
Subject: Alaska Pipeline Project update

TransCanada and ExxonMobil are working together to advance the Alaska Pipeline Project. The goal is to build and operate a pipeline system that will make possible the development of Alaska’s vast North Slope natural gas resources, helping sustain Alaska’s, Canada’s and the U.S. economies and providing a reliable, clean supply of domestic energy for the State of Alaska and North America. The Alaska Pipeline Project provides Alaska a viable option to develop its North Slope natural gas resources.
The Alaska Pipeline Project has filed its plan for holding the first natural gas pipeline open season in the history of the North Slope in 2010 - a major milestone in the development of Alaska’s vast natural gas reserves.
The Alaska Gasline Inducement Act (AGIA) was enacted into state law in 2007 to expedite the construction of a pipeline to transport Alaska’s natural gas resources to market. TransCanada became the official AGIA licensee in 2008 and is now working with ExxonMobil to advance the Alaska Pipeline Project.
Project Description
The Alaska Pipeline Project proposes to design, permit and construct a new natural gas pipeline system beginning near the Point Thomson field and extending through Alaska over one of two alternative routes. One route, the Alberta option, would extend from Point Thomson to points near Prudhoe Bay, Fairbanks, and Delta Junction, and then to the Alaska-Canada border, where the pipeline would interconnect to a new pipeline in Canada. The pipeline in Canada would extend from the Alaska-Canada border to an interconnection point with pipeline systems near Boundary Lake, Alberta, Canada, providing the capability of transporting natural gas into the contiguous United States.
An alternative pipeline route, the Valdez option , would extend from the Point Thomson field through points near Prudhoe Bay, Fairbanks, Delta Junction, and then to an interconnection point with LNG facilities (to be built by third parties) near Valdez, Alaska.
In both options, a minimum of five in-state connections to the main pipeline in Alaska, called off-takes, would provide local natural gas suppliers the opportunity to obtain natural gas to meet community needs. For the Alberta option, local off-takes will also be available along the pipeline route in Canada.The Alaska Pipeline Project proposes to design, permit and construct a new gas treatment plant (GTP) as an integral component of the project’s facilities. It would be located near existing Prudhoe Bay facilities and operate in conjunction with either the Alberta or the Valdez options.A natural gas transmission pipeline connecting the Point Thomson field to the GTP is also a proposed component of both options.
The Alaska Pipeline Project is a world-class undertaking in all of its aspects.The gas transmission pipeline between the Point Thomson field and the GTP consists of a 32-inch pipeline, approximately 58 miles in length, with no compression. The initial capacity of this pipeline has been set at 1.1 billion cubic feet per day (Bcf/d) and is expandable.
The GTP as currently envisioned would be made up of four trains for the Alberta option, with an initial design to treat up to 5.3 Bcf/d of raw gas and the ability to deliver into the pipeline 4.5 Bcf/d of treated gas. The Valdez option would have three trains and treat up to 3.5 Bcf/d of raw natural gas and would have the ability to deliver into the pipeline 3.0 Bcf/d of treated natural gas.
The Alberta option would include an approximately 1700-mile, 48-inch diameter pipeline (734 miles in Alaska and 966 miles in Canada). The initial capacity would be 4.5 Bcf/d, expandable with compression to 5.9 Bcf/d. Under the 4.5 Bcf/d base design, the system would include six compressor stations in Alaska and eleven in Canada, expanding to a total of thirty three compressor stations under the 5.9 Bcf/d case. Given that the pipeline would operate in areas of continuous and discontinuous permafrost, gas chillers would be installed at the GTP and at several of the compressor stations located along the pipeline route.
The Valdez option would include an approximately 800-mile, 48-inch diameter pipeline, and would have two compressors to support the initial design capacity of 3.0 Bcf/d.

[ Next Thread | Previous Thread | Next Message | Previous Message ]

Post a message:
This forum requires an account to post.
[ Create Account ]
[ Login ]
[ Contact Forum Admin ]


Forum timezone: GMT-8
VF Version: 3.00b, ConfDB:
Before posting please read our privacy policy.
VoyForums(tm) is a Free Service from Voyager Info-Systems.
Copyright © 1998-2019 Voyager Info-Systems. All Rights Reserved.