VoyForums
[ Show ]
Support VoyForums
[ Shrink ]
VoyForums Announcement: Programming and providing support for this service has been a labor of love since 1997. We are one of the few services online who values our users' privacy, and have never sold your information. We have even fought hard to defend your privacy in legal cases; however, we've done it with almost no financial support -- paying out of pocket to continue providing the service. Due to the issues imposed on us by advertisers, we also stopped hosting most ads on the forums many years ago. We hope you appreciate our efforts.

Show your support by donating any amount. (Note: We are still technically a for-profit company, so your contribution is not tax-deductible.) PayPal Acct: Feedback:

Donate to VoyForums (PayPal):

Login ] [ Contact Forum Admin ] [ Main index ] [ Post a new message ] [ Search | Check update time | Archives: 1234 ]


[ Next Thread | Previous Thread | Next Message | Previous Message ]

Date Posted: 13:39:24 08/23/06 Wed
Author: essam alhumaidi (essam est.)
Subject: Re: Bitumen Grade 60/70 packed in drums
In reply to: Saleem Peerzada 's message, "Bitumen Grade 60/70 packed in drums" on 20:50:28 09/24/03 Wed

>Dear Mr.Soltani,
>
>Please find the specification of Bitumen Grade 60/70
>as required by us. Please let us know if you can
>supply as per our
>specs:
>No. Properties Specification Test Methods
> AC 60-70
> Asphalt Cement
>1 Penetration at 25°C, 100 g., 5 sec.; 0.1 mm. 60 to
>70 TIS.1201
>2 Flash point (Cleveland open cup) : Minimum, °C 232
>TIS.1182 Vol. 2
>3 Softening Point ; °C 45-55 TIS.1216
>4 Ductility at 25°C, 5 cm. per min.; Minimum, cm. 100
>TIS.1202
>5 Solubility in trichloroethylene ; Minimum, % 99
>TIS.1203
> Residue from Thin-film oven test
>6 Loss on heating ; Maximum, % 0.8 TIS.1223
>7 Retained Penetration ; Minimum, % from original 54
>TIS.1223 and
> TIS.1201
>8 Ductility at 25°C ; 5 cm. per min. ; Minimum, cm. 50
>TIS.1223 and
> TIS.1202
>
>The quality and quantity has to be correct.
>
>Also many companies agree for price take the L/C and
>then are not able to sell. Can you give performance
>garuntee as well.
>
>Please quote your firm FOB price per metric Ton in
>Drums of Bitumen Grade 60/70 as per our specs.
>
>Quantity required is 3000 M
>
>Your early reply will be apprecited.
>
>Best Regards,
>essam alhumaidi

[ Next Thread | Previous Thread | Next Message | Previous Message ]

Post a message:
This forum requires an account to post.
[ Create Account ]
[ Login ]
[ Contact Forum Admin ]


Forum timezone: GMT-8
VF Version: 3.00b, ConfDB:
Before posting please read our privacy policy.
VoyForums(tm) is a Free Service from Voyager Info-Systems.
Copyright © 1998-2019 Voyager Info-Systems. All Rights Reserved.